The Fair View Story

2012 – Present

Tracing Our History

\

Empty Shell

\

Fix the roof

\

Stay in a Caravan

\

Looking good

Foundations

2013

From the beginning we have virtually built a new house and we are proud of our achievements: investing a lot of love into the build and that all the changes we have made are in keeping with the age and style of the house. Here the ground floor is being built.

Second Floor Flooring

2013

If we didn’t have any help we would probably still be building it now. In this picture we were lucky with the weather and could lay flooring without lots of cover. We have a picture Gallery of many of the stages of the build. Please take a look.

Roofing

2013

There was a lot to do on the roof with new insulation and retiling with Kent peg tiles and in this photograph we see Gez getting stuck in. Both of us have spent years bringing up Fair View Bed and Breakfast to how it looks now.

Driveway

2013

For much of the time that we spent rebuilding the house to how it is now we saw lots of bricks and rubble.
Once we started doing B&B we kept the mess at bay, so our guests were never inconvenienced.